Skip to content
English
  • There are no suggestions because the search field is empty.

SOP 19: Allocating a Chef Lead and Dispatch Date from the 99s

To assign ownership of a project to the appropriate chef and allocate a dispatch date once a project has moved into the 99s – Culinary stage. This ensures the correct chef is notified and the project can progress through the sampling process.


When to Use

Use this process when:

  • A project enters the 99s – Culinary view.
  • A chef needs to be assigned responsibility.
  • A dispatch date has been agreed.
  • Work is ready to be allocated.

Before You Start

You must have:

  • Access to the Gates area.
  • Access to the 99s – Culinary tracker.
  • Knowledge of which chef will own the project.
  • An agreed dispatch date.

Video Walkthrough

🎥 SOP 19 – Allocating a Chef Lead and Dispatch Date from the 99s


Process Steps

Step 1: Open the 99s Tracker

  1. Navigate to Gates.
  2. Select 99s – Culinary.
  3. Locate the project requiring assignment.

Step 2: Review Project Details

Before assigning ownership:

  1. Open the project record.
  2. Review:
    • Gate Name
    • Customer
    • Product Details
    • Notes
    • Sample Due Date
    • Delivery Notes

⚠️ Always check the notes section before assigning work.


Step 3: Allocate a Chef Lead

  1. Locate the Chef Lead column.
  2. Click into the field.
  3. Select the appropriate chef from the dropdown list.

Example:

  • Emma
  • Nicola
  • Rob
  • Jason

(according to current team structure)


Step 4: Save the Chef Lead

  1. Confirm the correct chef has been selected.
  2. Wait for HubSpot to save the update.

You should see a confirmation message similar to:

"Chef Lead changes saved"


Step 5: Allocate a Dispatch Date

  1. Locate the Dispatch Date field.
  2. Click into the date field.
  3. Select the required dispatch date.
  4. Confirm the date has been saved.

Step 6: Verify Assignment

Check that:

✓ Chef Lead is populated.

✓ Dispatch Date is populated.

✓ Correct project has been updated.

✓ Changes have been saved.


Best Practice

Before allocating work:

  • Review current chef workloads.
  • Consider project priority.
  • Check dispatch commitments.
  • Ensure delivery dates are achievable.

Common Mistakes

❌ Assigning the wrong chef.

❌ Forgetting to allocate a dispatch date.

❌ Not reviewing project notes.

❌ Updating the wrong project.

❌ Leaving the record before changes save.


Success Criteria

The process is complete when:

✓ A Chef Lead has been assigned.

✓ A Dispatch Date has been entered.

✓ The assignment has been saved successfully.

✓ The project is visible in the chef's workload.


Related SOPs
  • SOP 04 – Creating a Personal View
  • SOP 05 – Adding an Existing View
  • SOP 06 – Editing Columns in a Personal View
  • Sample Tracker Overview
  • Chef Workload Management